Promise Technology E610s Handbuch Seite 261

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 434
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 260
Chapter 5: Management with the CLU
243
Starting Up After Shutdown
There are two methods for shutting down the subsystem. Choose one of the
following procedures:
Starting up the VTrak – Telnet Connection (page 243)
Starting up the VTrak – SSH Connection (page 243)
Starting up the VTrak – Serial Connection (page 244)
Starting up the VTrak – Telnet Connection
To start the RAID subsystem:
1. Manually turn on the power supply switches on the back of the subsystem.
2. Wait about two minutes.
3. Establish a Telnet connection to the VTrak.
See “Making a Telnet Connection” on page 167.
If you cannot log in, wait 30 seconds and try again.
4. Type menu and press Enter to open the CLU.
Starting up the VTrak – SSH Connection
To start the RAID subsystem:
1. Manually turn on the power supply switches on the back of the subsystem.
2. Wait about two minutes.
3. Establish a SSH connection to the VTrak.
See “Making a SSH Connection” on page 167.
If you cannot log in, wait 30 seconds and try again.
4. Type menu and press Enter to open the CLU.
Important
If you have a JBOD Expansion, always power on the JBOD
subsystems first. Then power on the RAID subsystem.
Important
If you have a JBOD Expansion, always power on the JBOD
subsystems first. Then power on the RAID subsystem.
Seitenansicht 260
1 2 ... 256 257 258 259 260 261 262 263 264 265 266 ... 433 434

Kommentare zu diesen Handbüchern

Keine Kommentare