Promise Technology E610s Handbuch Seite 184

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 434
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 183
VTrak E-Class Product Manual
166
Initial Connection
Making an initial connection includes the following functions:
Making a Serial Connection (page 166)
Making a Telnet Connection (page 167)
Making a SSH Connection (page 167)
Logging In (page 168)
Accessing Online Help (page 169)
Exiting the CLU (page 169)
Logging Out of the CLI (page 170)
Logging Back Into the CLI and CLU (page 170)
Making a Serial Connection
Before you begin, be sure the RJ11-to-DB9 serial data cable is connected
between the Host PC and VTrak, and that both machines are booted and
running.
Figure 1. Serial port on the controller
Then do the following actions:
1. Change your terminal emulation program settings to match the following
specifications:
Bits per second: 115200
Data bits: 8
Parity: None
Stop bits: 1
Flow control: none
2. Start your PC’s terminal VT100 or ANSI emulation program.
3. Press Enter once to launch the CLI.
Mgmt
UPS
115200
8 N 1
FC 1 FC 2
4
2
1
Gb/s
4
2
1
Gb/s
Serial port
Seitenansicht 183
1 2 ... 179 180 181 182 183 184 185 186 187 188 189 ... 433 434

Kommentare zu diesen Handbüchern

Keine Kommentare